Furthermore, all our manufacturing procedures are in compliance with ISO9002 requirements. Our items are created by present day computerized machinery and gear. makes certain the balance and regularity of the important function of elements. one.Description
Product name | OEM gray/ductile/bronze sand casting EPT human body component |
Software | EPT industry, EPTTry components, EPT EPTTry, contruction market and so forth. |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rds offered | ductile iron, grey iron,carbon steel, alloy metal, stainless steel and so forth. |
Manufacturing procedure | sand castiing, expense casting,precision casting, machining and so forth. |
Dimension | EPT by your requirement . |
Suitable drawing formats | DWG,DXF,IGES,STEPT,PDF |
EPTT | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd export plywood scenario . |
Shipping and delivery time | 30 daEPTTnormally. |
Payment | T/T, L/C,D/P,Paypal. |
Port | EPTTngdao, EPTT |
Certifications | ISO90012008 |
Principal Industry | North of The united states, Australia, Center EPT and so on. |
Manufacturing potential | 10,000,000 pcs/yr |
two. Bulk oeder
3. Sand casting products
Plant has massive-scale casting products of 50 sets, we have diverse EPT with distinct variety
of sand sort and elements condition. The biggest casting we can cast is fifteen tons. Our yearly capacity for
sand casting is about 2000 tons for solid steel and 30000 tons for solid iron.
four.Inspection process:
In orEPTTto ensure the good quality of the orders, our independent QC associates to have out stringent inspection
Certificate
five.EPTT amp EPT
1.) wood, carton
two.) pallet
three.) as customers’ prerequisite.
6.FAQ
1. How can I get thequotation?
Remember to send out us information for quote: drawing, material, excess weight, amount and request.
- two. If we will not have drawing, can you make drawing for me?
Sure, we make the drawing of your sample and duplicate the sample.
- 3. When can I get thesample?
Sample: 25-30 times right after you start to make mildew. The correct time relies upon on your product.
- four. What is your primary orEPTTtime?
OrEPTTtime: 35-forty days following the payment. The precise time is dependent on your solution.
- five. What is yourpayment approach?
EPT: a hundred% TT EPTd.
Main buy: fifty% deposit, equilibrium fifty% to be compensated before shipment.
- 6. Which sort of file structure you can read?
PDF, ISGS, DWG, STEPT, MAX..