Our merchandise are applied in many fields. In the meantime, our goods are manufactured in accordance to substantial quality expectations, and complying with the global innovative normal standards. Furthermore, WE CAN Create Customized VARIATORS, GEARED MOTORS, Electric powered MOTORS AND OTHER HYDRAULIC Items In accordance TO CUSTOMERS’ DRAWINGS.
EPT knowledge listing:
Kind: | Worm Gear Speed EPT |
Design: | NMRV571–a hundred and fifty |
Ratio: | one:7.five,10,15,20,25,30,forty,50,sixty,80,100 |
Shade: | Blue/Silver Or On Consumer Request |
EPT | EPT: Blue-Colored Solid-Iron Worm Gear-Copper-10-three# Worm-20CrMn Ti with carburizing and quenching, area harness is fifty six-62HRC Shaft-chromium steel-45# |
Lubricant: | Synthetic ampMineral |
EPT: | C ampU EPT |
Seal: | NAK SKF |
Warranty: | -30-forty degC |
ICE FLANGE | 80B5,90B5,100B5,112B5,132B5,160B5 |
Rated EPT: | .06KW,.12KW,.25KW,.75KW,1.5KW,3KW,5.5KW,7.5KW |
Application | EPTlurgical EPTry, meals EPTry, phase EPTry, welding EPTry, street EPTry, amusement EPTs, EPT EPTry, EPT and plastic EPTry, environmental protection EPTry ,engineering EPTry, construction EPTry, EPT device sector, automotive sector, EPT and transportation and so on |
NMRV | PAM | N | M | P | D | |||||||||||
ICE | 5 | 7.five | ten | fifteen | twenty | twenty five | thirty | forty | fifty | 60 | eighty | one hundred | ||||
twenty five | 56B14 | 50 | 65 | eighty | 9 | nine | nine | nine | nine | 9 | nine | nine | nine | |||
30 | 63B5 | 95 | a hundred and fifteen | 140 | 11 | 11 | 11 | eleven | eleven | eleven | eleven | 11 | eleven | |||
63B14 | sixty | 75 | ninety | |||||||||||||
56B5 | 80 | one hundred | a hundred and twenty | 9 | nine | 9 | 9 | nine | 9 | 9 | 9 | nine | 9 | nine | ||
56B14 | fifty | sixty five | eighty | |||||||||||||
forty | 71B5 | 110 | one hundred thirty | one hundred sixty | 14 | fourteen | 14 | 14 | fourteen | fourteen | fourteen | 14 | ||||
71B14 | 70 | eighty five | 105 | |||||||||||||
63B5 | 95 | 115 | 140 | eleven | eleven | eleven | eleven | eleven | eleven | eleven | eleven | eleven | 11 | eleven | eleven | |
63B14 | 60 | 75 | ninety | |||||||||||||
56B5 | 80 | one hundred | 120 | 9 | 9 | 9 | 9 | |||||||||
50 | 80B5 | one hundred thirty | a hundred sixty five | 200 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | 80 | 100 | one hundred twenty | |||||||||||||
71B5 | a hundred and ten | one hundred thirty | 160 | fourteen | fourteen | 14 | 14 | fourteen | fourteen | 14 | 14 | fourteen | fourteen | 14 | ||
71B14 | 70 | eighty five | 105 | |||||||||||||
63B5 | ninety five | one hundred fifteen | a hundred and forty | eleven | eleven | eleven | eleven | 11 | ||||||||
63 | 90B5 | a hundred thirty | 165 | 200 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | ninety five | a hundred and fifteen | 140 | |||||||||||||
80B5 | one hundred thirty | 165 | two hundred | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | ||||
80B14 | 80 | a hundred | one hundred twenty | |||||||||||||
71B5 | 110 | a hundred thirty | 160 | 14 | fourteen | fourteen | fourteen | 14 | ||||||||
71B14 | 70 | eighty five | one zero five | |||||||||||||
seventy five | a hundred/112B5 | one hundred eighty | 215 | 250 | 28 | 28 | 28 | |||||||||
a hundred/112B14 | one hundred ten | a hundred thirty | a hundred and fifty | |||||||||||||
90B5 | one hundred thirty | one hundred sixty five | two hundred | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
90B14 | 95 | one hundred fifteen | one hundred forty | |||||||||||||
80B5 | a hundred thirty | 165 | 200 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | 19 | |||||
80B14 | 80 | a hundred | a hundred and twenty | |||||||||||||
71B5 | a hundred and ten | 130 | a hundred and sixty | fourteen | fourteen | 14 | fourteen | |||||||||
ninety | 100/112B5 | 190 | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
one hundred/112B14 | one hundred ten | one hundred thirty | one hundred sixty | |||||||||||||
90B5 | one hundred thirty | one hundred sixty five | two hundred | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||
90B14 | 95 | 115 | a hundred and forty | |||||||||||||
80B5 | a hundred thirty | one hundred sixty five | 200 | 19 | 19 | 19 | 19 | 19 | ||||||||
80B14 | eighty | a hundred | a hundred and twenty | |||||||||||||
one hundred ten | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | ||||||||
a hundred/112B5 | one hundred eighty | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||
90B5 | 130 | one hundred sixty five | 200 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||
80B5 | one hundred thirty | one hundred sixty five | 200 | 19 | 19 | |||||||||||
130 | 132B5 | 230 | 265 | three hundred | 38 | 38 | 38 | 38 | 38 | 38 | 38 | |||||
one hundred/112B5 | 180 | 215 | 250 | 28 | 28 | 28 | 28 | 28 | 28 | 28 | ||||||
90B5 | a hundred thirty | 165 | two hundred | 24 | 24 | |||||||||||
a hundred and fifty | 160B5 | 250 | three hundred | 350 | 42 | forty two | forty two | forty two | 42 | |||||||
132B5 | 230 | 265 | 250 | 38 | 38 | 38 | 38 | 38 | 38 | |||||||
a hundred/112B5 | a hundred and eighty | 215 | two hundred | 28 | 28 | 28 | 28 |
Components:
1. EPT: Die-cast EPT Alloy EPT (RV571~RV090)
Forged Iron EPT (RV110~RV150)
two. Worm Wheel: Wearable Tin Bronze Alloy, EPT Bronze Alloy
3. Worm Shaft: 20Cr Steel, carburizing, quenching, grinding, area hardness fifty six-62HRC, .three-.5mm remaining carburized layer following precise grinding
four. Input Configurations:
Equipped with Electric powered EPTs (AC EPT, Brake EPT, DC EPT, Servo EPT)
IEC-normalized EPT Flange
Solid Shaft Enter
Worm Shaft EPTil Extension Input
5. Output Configurations: Keyed Hollow Shaft Output
Hollow Shaft with Output Flange
Plug-in Reliable Shaft Output
6. EPT Components: Worm Shaft EPTil Extension, Solitary Output Shaft, EPT Output Shaft, Output Flange, Torque Arm, Dust EPT
seven. EPT Painting:
EPT Alloy EPT:
Following Shot Blasting, Anticorrosion Remedy and Phosphating, Paint with the Shade of RAL 5571 Gentian Blue or RAL 7035 LigEPT Gray
Forged Iron EPT:
Right after Portray with Crimson Antirust Paint, Paint with the Colour of RAL 5571 Gentian Blue
Workshop present
FAQ
Qone. What is your conditions of EPT?
A: EPTly, we pack our products in one colour box. If you have EPT ask for about EPT, pls negotiate with us EPT, we can pack the items as your request.
Q2. What is your terms of payment?
A: T/T thirty% as deposit, and 70% prior to delivery. We are going to display you the images of the goods and offers
prior to you pay out the stability. Other payments phrases, pls negotiate with us EPT, we can talk about.
Q3. What is your conditions of supply?
A: EXW, FOB, CFR, CIF.
Q4. How about your shipping time?
A: EPTly, it will get 25 to thirty daEPTafter receiving your EPT payment. The certain shipping and delivery time is dependent
on the things and the amount of your get.
Q5. Can you make according to the samples?
A: Sure, we can generate by your samples or technological drawings. We can develop the molds and fixtures.
Q6. What is your sample plan?
A: We can source the sample if we have ready areas in stock, but the buyers have to pay the sample EPT and
the courier EPT.We welcome sample order.
Q7. Do you test all your products just before supply?
A: Yes, we have a hundred% take a look at just before supply
Q8: How do you make our business EPT-time period and very good connection?
one. We preserve great quality and aggressive cost to make sure our consumers gain
two. We regard each buyer as our pal and we sincerely do enterprise and make buddies with them,
no make a difference the place they occur from.